Home/What We Do
5 Divisions · 1 Group

One partner that
designs, builds, & protects
with the Jasmino Group.

Most projects need 3-4 vendors. Each handoff introduces delays, miscommunication, and finger-pointing. HAW removes the handoffs: with the Jasmino Group, five divisions share data, tooling, and accountability.

Scroll
How It Works

Click each stage to see how capabilities connect

Every stage feeds data, constraints, and context to the next. No re-interpretation. No translation loss.

Stage 01 · Design

Engineering designs with fabrication and lining constraints baked in from day one

The Jasmino Group's design engineers in India work to our manufacturing tolerances, lining thicknesses, and the nozzle orientations that make autoclave access possible. These aren't afterthoughts. They're inputs to the first sketch.

Feeds into next stage →
3D model + fabrication drawings transfer directly to the shop floor. Manufacturing works from the same data: no re-drafting, no interpretation gaps.
Proof, Not Promises

See what integration looks like

Vessel Lift · HAW
ENG
Vessel Lift · HAW
Heavy-haul loading by crane
Vessel Machining
MFG
Vessel Machining
HAW works, Bockenem
Rubber Lining Application
COR
Rubber Lining Application
HAW works, Bockenem
Onsite Erection & Commissioning
ERECT
Onsite Erection & Commissioning
Mechanical, Structural, Piping & E&I
Capabilities

What each division delivers

Click any row to jump to the service page for full specifications.

CapabilityEngineeringManufacturingProtectionErection
Process Design (P&IDs, PFDs)———
3D Plant Modelling (SP3D)———
Pressure Vessel Fabrication——
FRP / Plastic Equipment——
Rubber Lining Application———
Plastic Lining (PVC, PP, PVDF)———
Mechanical & Structural Erection———
Piping & E&I Installation———
In-Service Inspection & Repair———
Stress Analysis (CAESAR II, FEA)———
Water Treatment Systems—
Design codes we build to.
AD 2000 · EN 13445 · ASME
View All Certifications

Ready to discuss your project?

Share your requirements. We'll show you how integration eliminates gaps.

1899lining since